1266637399841235_1d60-jpg-1800x1200-yandex

HOTEL ANGELO

The angelo airport hotel is a 4 star hotel in Ekaterinburg with 211 rooms. MonolitStroy LLC executed reinforced concrete works of the project – 10 floors including parking in 3 months.
vinograd

VINOGRADNAYA

Project is located at Vinogradnaya street, Sochi. MonolitStroy LLC executed the construction of the 18-storey building in turn-key basis.
kolcovos

AIRPORT KOLCOVO

Ekaterinburg Airport new International Airlines Terminal Building (capacity – 1600 passengers per hour, square – 45 000 sq.m.) reinforced concrete works is executed by MonolitStroy LLC in 4 months.
antey

ANTEY

Аntey is the highest building in Ekaterinburg. MonolitStroy LLC  executed the concrete works of the 11 storey parking building using post tensioning system in slabs.
описание1 описание1 описание1 описание1 описание1 описание1 описание1 описание1 описание1 описание1 описание1 описание1

SUMMIT

The summit business center has two administrative Building blocks having 11 and 22 floors respectively. Two Buildings are connected to each other with a shopping gallery Of two stores. Monolitstroy carried out this turnkey project.
описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2

URALAIRLINES

The head office of ural airlines is located at utrenni street Close to airport. Monolitstroy executed the reinforced concrete works Of this unique building.
описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3

ANTIPINSKY OIL PROCESSING PLANT

In construction of the 3rd line of antipinsky oil refinery plant monolitstroy llc executes works on arrangement Of reinforced concrete frames of buildings, as well as installation of metal structures And pipelines.

Complited projects

ha HOTEL ANGELO He fulfilled reinforced concrete works of ten floors, including parking, for 3 months
266690ef66 Airport Kolcovo New construction Yekaterinburg Airport
zavod-agar-v-elabuge-493-izobrazheniya-najdeno-v-yandeks-kartinkax-yandex AGAR The project was successfully commissioned in March 2013
1472414254720 GOTVALDA Built 18-storey building and a parking lot under the key.
1474051452277 Polypropylene production plant The construction work of reinforced concrete frames and earthworks.
naberezhnye-chelny-lerua-merlen-poisk-v-google-google-chrome LEROY MERLIN Successfully implemented reinforced concrete works.
ser SEROVA Project of the three buildings is successfully executed.
bmwcenter BMW Center Successfully completed reinforced concrete works for BWM center in Yekaterinburg.
npz-oao-taif-nk-nizhnekamsk-7-tys-izobrazhenij-najdeno-v-yandeks-kartinkax-yandex TAIF NIJNEKAMSK OIL PROCESSING PLANT Completed installation of steel structures and pipelines.
1472410357643 ANTIPINSKY OIL PROCESSING PLANT Completed installation of steel structures and pipelines.
uralskie-avialinii-ekaterinburg-poisk-v-google-google-chrome URALAIRLINES Successfully implemented reinforced concrete works of this unique building.
1474049198887 AIRPORT OF SIMFEREPOL Reinforced concrete frames of the main terminal and additional buildings
1472413339365 ANTEY Submitted reinforced concrete works and the 11-storey car park, with prestressed slabs.
aasdasdasd PRODUCTION AND WAREHOUSE COMPLEX FOR DRYLOCK TECHNOLOGIES The successful implementation of turnkey project.
Monolitsrtoy_Katalog_new_PRINT.pdf — Просмотр документов – Yandex SUMMIT The project was implemented under the key.
kontejnernyj-centr-ekaterinburg-11-tys-izobrazhenij-najdeno-v-yandeks-kartinkax-yandex Container Center The successful implementation of a container center project
lm LUXURY MALL Successfully implemented concrete and facade work, including fiber-reinforced concrete facade.
ak AKADEMICHESKY It participated in the construction of two buildings.
1474046674036 COSKUNOZ ALABUGA The successful implementation of the construction of the plant in Yelabuga
premer-ekaterinburg-23-tys-izobrazhenij-najdeno-v-yandeks-kartinkax-yandex PREMIER The project consisted of 7 buildings (floors 9-28), including underground parking.
1472410811109 KOLUMAN Construction works "turnkey".
fr FURMANOVA MonolitStroy LLC was the general contractor and completed the project "turnkey".
sbur SBERBANK URAL Successfully implemented reinforced concrete works of this unique building.
vin VINOGRADNAYA Successfully completed project of 18-storey building
ekaterinburg-universitetskij-22-tys-izobrazhenij-najdeno-v-yandeks-kartinkax-yandex UNIVERSITETSKY The project included 9 buildings (14-26 floors).

Ongoing projects

1474049198887 AIRPORT OF SIMFEREPOL Reinforced concrete frames of the main terminal and additional buildings
1474051452277 Polypropylene production plant The construction work of reinforced concrete frames and earthworks.
1472410357643 ANTIPINSKY OIL PROCESSING PLANT Completed installation of steel structures and pipelines.