1266637399841235_1d60-jpg-1800x1200-yandex

HOTEL ANGELO

The angelo airport hotel is a 4 star hotel in Ekaterinburg with 211 rooms. MonolitStroy LLC executed reinforced concrete works of the project – 10 floors including parking in 3 months.
vinograd

VINOGRADNAYA

Project is located at Vinogradnaya street, Sochi. MonolitStroy LLC executed the construction of the 18-storey building in turn-key basis.
kolcovos

AIRPORT KOLCOVO

Ekaterinburg Airport new International Airlines Terminal Building (capacity – 1600 passengers per hour, square – 45 000 sq.m.) reinforced concrete works is executed by MonolitStroy LLC in 4 months.
antey

ANTEY

Аntey is the highest building in Ekaterinburg. MonolitStroy LLC  executed the concrete works of the 11 storey parking building using post tensioning system in slabs.
описание1 описание1 описание1 описание1 описание1 описание1 описание1 описание1 описание1 описание1 описание1 описание1

SUMMIT

The summit business center has two administrative Building blocks having 11 and 22 floors respectively. Two Buildings are connected to each other with a shopping gallery Of two stores. Monolitstroy carried out this turnkey project.
описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2 описание2

URALAIRLINES

The head office of ural airlines is located at utrenni street Close to airport. Monolitstroy executed the reinforced concrete works Of this unique building.
описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3  описание3

ANTIPINSKY OIL PROCESSING PLANT

In construction of the 3rd line of antipinsky oil refinery plant monolitstroy llc executes works on arrangement Of reinforced concrete frames of buildings, as well as installation of metal structures And pipelines.

Complited projects

npz-oao-taif-nk-nizhnekamsk-7-tys-izobrazhenij-najdeno-v-yandeks-kartinkax-yandex TAIF NIJNEKAMSK OIL PROCESSING PLANT Completed installation of steel structures and pipelines.
1472410357643 ANTIPINSKY OIL PROCESSING PLANT Completed installation of steel structures and pipelines.
zavod-agar-v-elabuge-493-izobrazheniya-najdeno-v-yandeks-kartinkax-yandex AGAR The project was successfully commissioned in March 2013
ak AKADEMICHESKY It participated in the construction of two buildings.
1474046674036 COSKUNOZ ALABUGA The successful implementation of the construction of the plant in Yelabuga
aasdasdasd PRODUCTION AND WAREHOUSE COMPLEX FOR DRYLOCK TECHNOLOGIES The successful implementation of turnkey project.
1472413339365 ANTEY Submitted reinforced concrete works and the 11-storey car park, with prestressed slabs.
Monolitsrtoy_Katalog_new_PRINT.pdf — Просмотр документов – Yandex SUMMIT The project was implemented under the key.
1472410811109 KOLUMAN Construction works "turnkey".
sbur SBERBANK URAL Successfully implemented reinforced concrete works of this unique building.
266690ef66 Airport Kolcovo New construction Yekaterinburg Airport
1474051452277 Polypropylene production plant The construction work of reinforced concrete frames and earthworks.
ekaterinburg-universitetskij-22-tys-izobrazhenij-najdeno-v-yandeks-kartinkax-yandex UNIVERSITETSKY The project included 9 buildings (14-26 floors).
1474049198887 AIRPORT OF SIMFEREPOL Reinforced concrete frames of the main terminal and additional buildings
bmwcenter BMW Center Successfully completed reinforced concrete works for BWM center in Yekaterinburg.
ser SEROVA Project of the three buildings is successfully executed.
premer-ekaterinburg-23-tys-izobrazhenij-najdeno-v-yandeks-kartinkax-yandex PREMIER The project consisted of 7 buildings (floors 9-28), including underground parking.
1472414254720 GOTVALDA Built 18-storey building and a parking lot under the key.
uralskie-avialinii-ekaterinburg-poisk-v-google-google-chrome URALAIRLINES Successfully implemented reinforced concrete works of this unique building.
ha HOTEL ANGELO He fulfilled reinforced concrete works of ten floors, including parking, for 3 months
kontejnernyj-centr-ekaterinburg-11-tys-izobrazhenij-najdeno-v-yandeks-kartinkax-yandex Container Center The successful implementation of a container center project
naberezhnye-chelny-lerua-merlen-poisk-v-google-google-chrome LEROY MERLIN Successfully implemented reinforced concrete works.
fr FURMANOVA MonolitStroy LLC was the general contractor and completed the project "turnkey".
lm LUXURY MALL Successfully implemented concrete and facade work, including fiber-reinforced concrete facade.
vin VINOGRADNAYA Successfully completed project of 18-storey building

Ongoing projects

1474049198887 AIRPORT OF SIMFEREPOL Reinforced concrete frames of the main terminal and additional buildings
1472410357643 ANTIPINSKY OIL PROCESSING PLANT Completed installation of steel structures and pipelines.
1474051452277 Polypropylene production plant The construction work of reinforced concrete frames and earthworks.